Office Partition and Ceiling Upgrade in the CBD

An open floor split into four offices and a meeting room, with a new ceiling and lighting layout set out around the existing air-con.

Completed office fit-out with new ceiling, lighting and partitions

The tenant needed four enclosed offices and a meeting room out of an open floor, without moving a single air-con outlet.

Partition lines were set out against the existing ceiling grid first, so no office ended up with a diffuser split down the middle. Gypsum partitions run floor to soffit for the offices that needed acoustic separation, with glass fronts to keep the daylight; the meeting room is fully glazed. The ceiling was reworked as a concealed grid with new LED panels and access panels over every FCU.

Works ran in two phases so half the floor stayed occupied throughout, with the noisy setting-out done outside office hours.